home.social

#tepcolies — Public Fediverse posts

Live and recent posts from across the Fediverse tagged #tepcolies, aggregated by home.social.

  1. World’s biggest #NuclearPlant fires up 1,356MW reactor after 13-year freeze

    Story by Everett Sloane, February 11, 2026

    Excerpt: "Coverage of the planned restart has noted that Japan’s #Kashiwazaki and Kariwa units faced a suspension just hours after an earlier attempt began, after a minor malfunction triggered alarms. Separate reporting on Jan developments stressed that the significance of bringing Reactor No. 6 online was rising as tight supply threatened winter reliability, a reminder that grid operators are juggling risk on two fronts at once: the risk of another accident and the risk of blackouts if demand outstrips capacity. This dual pressure is why I see unit 6 less as a side story and more as the template regulators will use to judge whether No. 7 can safely move from fuel loading to full power."

    Read more:
    msn.com/en-us/news/world/world

    #KashiwazakiKariwa #TEPCOLies #KEPCOLIes #RethinkNotRestart #NoNukes #Geothermal #WaveEnergy #Japan #JapanPol #RenewablesNow #FukushimaIsntOver

  2. From my friend in Japan...

    Two years after the release of treated water at the #FukushimaDaiichi #nuclear power plant began, more than a hundred thousand tons were washed into the sea, but new #contaminated water is occurring every day

    August 24, 2025 at 06:00

    "It has been two years since the ocean release of treated water accumulated at the #TEPCO’s Fukushima Daiichi nuclear power plant began. The radioactive substance #tritium remains in the water even after the purification process. In June, China, which completely stopped importing Japanese seafood, resumed production in 37 prefectures, but Fukushima and other ten prefectures are still not eligible. There is no end to the ocean release, and the impact of the nuclear accident on the fishing industry continues.

    "Tank treated water and contaminated water have been reduced by only fifty-six thousand tons.

    "The ocean release was first released on August 24th, and the 14th time was launched on August 7th this month. Up to the 13th time, a total of one hundred and eighty-seven tons of treated water were released.

    "The treated water and contaminated water stored in a tank on the site of the nuclear power plant before it was released into the ocean. So far, it has decreased to about fifty-six thousand tons, and it has not decreased by much the amount of release. The reason is that the contaminated water is generated about seventy tons every day, and the number of groundwater and rainwater increases due to the contact of molten nuclear fuel (debris) in the reactor building. Without the absence of contaminated water, we cannot stop releasing it into the ocean.

    "As of July 30th, TEPCO paid about JPY790 billion in compensation in response to the slump in fish prices associated with ocean release. There is a possibility that some of China's resumption of imports will also change the price of fish, but Fukushima Prefecture continues to be stopped.

    "37 Export application procedures for fishery products produced in Hokkaido Prefecture have begun. A person in charge of the processing and distribution section of the Fisheries Agency said, 'There are many applications, and the desire to resume is strong. We will continue to work with China to reopen the ten prefectures.' Riki Arai)

    "The place where the 'sludge' due to the treatment of contaminated water is about to be full.

    "Two years have passed since the release of treated water into the ocean due to the TEPCO’s Fukushima Daiichi nuclear accident. The treated water stored in the nuclear power plant is gradually reduced by ocean release, while the storage and disposal of sludge contaminated with high concentrations that continue to occur in the process of treatment of contaminated water is becoming an issue.

    "In the process of removing radioactive substances from contaminated water, sludge is produced by precipitating impurities with chemicals. Liquids and solids are mixed... " [Unfortunately, the rest is behind paywall]

    Source:
    tokyo-np.co.jp/article/430612

    #FukushimaIsntOver #TEPCOLied #TEPCOLies #WaterIsLife #OceansAreLife #WaterContamination #Radiation #Bioaccumulation #NoRadioactiveDumping #RethinkNotRestart #NoNukes #NoMoreFukushimas #NuclearWasteIsForever

  3. Oh yeah. Fast-tracking a #NuclearPlant restart is such a good idea...NOT!

    #ThreeMileIsland nuclear plant reboot fast-tracked to 2027

    By Laila Kearney
    June 25, 2025

    Excerpt: "Despite the enthusiasm, nuclear power plant projects have historically been far over budget [leaving taxpayers on the hook] and behind schedule [which is why nuclear plant companies often fabricate and lie about details. They milk it for all it's worth!]

    "No fully shut nuclear power plant has been restarted, but at least one other attempted restart - of the #PalisadesNuclearPlant in #Michigan - is under way.

    "As the technology industry drives U.S. electricity demand to record highs, nuclear power has broadly seen a resurgence of interest after decades in decline. New York plans to build a new nuclear power plant, which would be one of the first to be constructed in a generation."

    reuters.com/sustainability/cli

    #RethinkNotRestart #NoNukes #NoNukesForAI #BigTech #NuclearWaste #RethinkNotRestart #NuclearIsNotCarbonFree #Pennsylvania #CancerRates #TEPCOLies #HoltecLies #WaterIsLife #NuclearPowerPlants #Datacenters #AIPollution #MicrosoftSucks

  4. #Jellyfish Keep Attacking #NuclearPowerPlants

    By Gabriel Geiger
    November 2, 2021

    "Jellyfish are continuing to clog the cooling intake pipes of a nuclear power plant in Scotland, which has previously prompted a temporary shutdowns of the plant.

    "The #TornessNuclearPowerPlant has reported concerns regarding jellyfish as far back as 2011, when it was forced to shut down for nearly a week—at an estimated cost of $1.5 million a day—because of the free-swimming marine animals.

    "In a short comment to Motherboard, #EDFEnergy, which runs the Torness plant, said that 'jellyfish blooms are an occasional issue for our power stations,' but also said that media reports claiming the plant had recently been taken offline because of jellyfish are 'inaccurate.' '[There were] no emergency procedures this or last week related to jellyfish or otherwise,' a spokesperson said. [Um, did they previously work for #TEPCOLies?]

    " 'Like many other seaside power plants, the Torness plant uses seawater to prevent overheating. While there are measures in place to prevent aquatic life from entering the intake pipes, according to the #BulletinOfTheAtomicScientists, they are no match for the sheer number of jellyfish that come during so-called 'jellyfish blooms.'

    " 'Usually, screens prevent aquatic life and similar debris from being drawn into the power plants’ cooling system,' the Bulletin of the Atomic Scientists wrote in a 2015 blog post. 'But when sufficiently large volumes of jellyfish or other aquatic life are pulled in, they block the screens, reducing the volume of water coming in and forcing the reactor to shut down.'

    "While the case in Scotland has once again spotlighted concerns regarding the jellyfish and potential power plant shutdowns, these concerns are far from new. In 2008, a swarm of jellyfish shut down a nuclear power plant [#DiabloCanyon -- which had another incident in 2024] in #California, and three years later the same occurred at a plant in Japan [#Shimane]. In 2017, jellyfish clogged a power plant in Israel [#Hadera]."

    Source:
    vice.com/en/article/jellyfish-

    #GlobalWarming #WarmingOceans
    #ChangingOceans #OceansAreLife #OceanTemperatures #ClimateCrisis #Overfishing #NoDeepSeaMining #NoNewNukes #NoNukes #NoNukesForAI #Oskarshamn #Torness #RethinkNotRestart

  5. #Fukushima Now – Current State of Post-Accident Operations at Fukushima Daiichi Nuclear Power Station (August 2024 to January 2025)

    by Citizens' Nuclear Information Center · Published April 2, 2025 · Updated April 2, 2025

    By Matsukubo Hajime

    Excerpt: State of #ContaminatedWater

    "Contaminated water countermeasures at #FukushimaDaiichi #NuclearPower Station (#FDNPS) can be broadly divided into three areas: 1) Reduction of #groundwater flowing into buildings, 2) Reduction of #ContaminatedWater flowing into the sea, and 3) Reduction of the toxicity of contaminated water.

    "Countermeasures implemented to reduce water inflow into the buildings are, from higher elevations downward, (A) Pumping up groundwater at the groundwater bypass and releasing it into the sea (953,611m3 up to February 10, 2025), B) Installation of a frozen earth barrier (on-land water barrier, total length roughly 1,500m) surrounding FDNPS Units 1-4, C) Pumping up water at the subdrains and releasing it into the sea (1,801,404m3 up to February 9), and D) Paving of the site with asphalt to suppress permeation of rainwater into the soil. Measures to prevent the discharge of contaminated water into the ocean include A) Groundwater leakage prevention by a steel water barrier on the sea-side and B) Pumping up of groundwater dammed up behind the sea-side water barrier from the well points and groundwater drains. Due to these measures, the volume of contaminated water discharged, 540m3/day in May 2014, fell to 80m3/day in FY2023, and was below 100m3/day in FY2024.

    "In the reduction of the toxicity of contaminated water, cesium and strontium are removed, and after the removal of impurities using a reverse osmosis (RO) membrane, the multi-radionuclide removal equipment (ALPS – Advanced Liquid Processing System) then removes 62 radionuclides [NOT COMPLETELY!!!]. The water is then stored in tanks (containing 1,297,190m3 as of January 30, 2025. However, due to past equipment #malfunctions and operational policies, around 64% of the stored water exceeds the notification concentration).

    "Oceanic release of the ALPS-treated contaminated water began on August 24, 2023, a total of 78,285m3 being released in ten batches by January 2025. Table 2 shows the amounts released in each release and the total amount of tritium released. The concentration is gradually rising. One further release is scheduled during FY2024. In addition, roughly 15,720m3 of water remain in buildings, and a further 8,946m3 of strontium-treated water, etc., 5,644m3 of water treated by RO, and 9,463m3 of concentrated wastewater, etc. also exist onsite."

    Read more:
    cnic.jp/english/?p=8272
    #FukushimaIsntOver #WaterIsLife #PacificOcean #TEPCOLies #FukushimaNuclear #RethinkNotRestart #RadioactiveContamination #HormesisIsBullShit #Bioaccumulation

  6. From 2007:

    "Not Again": Yet Another #TEPCO Scandal

    Citizens' Nuclear Information Center

    "Over the years there have been all sorts of cases of data fabrication and falsification at #nuclear, thermal and hydroelectric power plants. Each time the power companies and plant makers apologize and say that they will lance the wound, but then they go and repeat the same behavior over and over again. When Tokyo Electric Power Company (TEPCO) reported yet another case of data falsification to the Ministry of Economy Trade and Industry (#METI) the headline in the Fukushima local newspaper the following day (1 February 2007) was 'Not Again!', sigh the local people and the Prefectural government '.

    "The latest scandal began when Asahi Shimbun newspaper reported on 31 October 2006 that #Chugoku Electric Power Company had falsified data for #DoyoDam on the #MatanoRiver. People might assume that the reason for #ChugokuElectric's admission was simply that it had made a judgment that the problem could no longer be concealed once it was leaked to the newspaper. However, there was more behind the admission than meets the eye. Even before this, anti-dam activists had been pursuing TEPCO over suspicious data related to its dams. For example, it had recorded flow measurements that could not possibly have been taken, because the locations were inaccessible due to heavy snow falls. Chugoku Electric's admission should be seen against this background.

    "METI and the Ministry of Land Infrastructure and Transport responded by demanding that all electric power companies check their records. The upshot was that it was discovered that Chugoku Electric was not alone. In fact, it became apparent that all power companies had falsified and fabricated data in relation to such things as subsidence of dam embankments, and alterations to facilities without prior approval.

    "The next major development came on November 15th, when it was revealed that Chugoku Electric had falsified data in relation to releases of hot wastewater at its #Shimonoseki thermal power plant. This led to similar revelations for nuclear power plants owned by TEPCO, #Kansai Electric Power Company (#KEPCO), Tohoku Electric Power Company and Japan Atomic Power Company (#JAPCO). On 10 January 2007 TEPCO submitted a report to METI entitled 'Causes of and measures to prevent a repetition of falsification of sea temperature data at the condenser outlets of #KashiwazakiKariwa Nuclear Power Plant, Reactors 1 and 4'.

    "The report said, 'An investigation of power plants was instigated, because the Shimonoseki thermal power plant case reminded a worker that corrections had been made to sea temperature data.' As a result, falsification (referred to by TEPCO as "corrections") was discovered at Kashiwazaki-Kariwa reactors 1 & 4 and #Fukushima I reactors 1, 4 & 5.

    "The hot wastewater referred to here is seawater, which has been used to cool and condense the steam used to drive the turbines of thermal and nuclear power plants. When the steam from the turbine condenses, its heat is transferred to the coolant, which in this case is seawater. The temperature of the seawater is raised in the process. If the seawater released is too hot, it can affect the ecosystem. Therefore, the temperature at both the intake and outlet points is measured and monitored to ensure that the temperature difference is not too great. At some power plants computers were programmed to record a higher than actual intake temperature, while at others they were programmed to record a lower outlet temperature. The readings were thus falsified to show a lower temperature difference than was really the case.

    "On 31 January 2007 TEPCO released details of data falsification at its nuclear power plants. It admitted to a total of about 200 irregularities. A few examples are discussed below.

    1. During a periodic inspection in May 1992 at Kashiwazaki-Kariwa reactor number 1 (K-K-1), the day before it was to be tested it was discovered that, due to a fault with the electric motor, the residual heat removal pump (part of the Emergency Core Cooling System (ECCS)) was not working. TEPCO staff made some adjustments to make it appear from the central control room that the pump was working. In this way, they were able to trick the METI inspector into awarding a pass for the inspection.

    2. Again at K-K (the reactors are not specified), from around 1995 to 1997, measurements of the concentration of radioactive iodine released from the exhaust stack were made to appear lower than they really were by taking the measurements on the reverse side of the filter. In May 1995 the concentration of radioactivity from rare gases emitted from the exhaust stack of reactor 4 was also falsified.

    3. From 1979 to 1998, in order to pass inspections, internal pressure readings for steam pipes connecting the reactor to the turbines at Fukushima I reactor 1 were falsified to match the specifications in the inspection guidelines. It was said that the specifications were inappropriate and that they were later amended so that falsification ceased to be necessary.

    "There were many instances of malpractice besides these, in relation to periodic inspections and also in other areas. Fabrication and falsification had indeed become standard practice. Investigations are still proceeding and one cannot help feeling that the most serious and dangerous cases are still to come."

    [And indeed it would come, 4 years later!]

    cnic.jp/english/newsletter/nit

    #CitizensNuclearInformatioNcenter #NoNukes #WaterIsLife #OceansAreLife #IAEAHides #TEPCOLies #FukushimaIsntOver #NoDumping #NuclearPowerPlants #RadioactiveWater #RethinkNotRestart #PacificOcean #DataFalsification