#tepcolies — Public Fediverse posts
Live and recent posts from across the Fediverse tagged #tepcolies, aggregated by home.social.
-
World’s biggest #NuclearPlant fires up 1,356MW reactor after 13-year freeze
Story by Everett Sloane, February 11, 2026
Excerpt: "Coverage of the planned restart has noted that Japan’s #Kashiwazaki and Kariwa units faced a suspension just hours after an earlier attempt began, after a minor malfunction triggered alarms. Separate reporting on Jan developments stressed that the significance of bringing Reactor No. 6 online was rising as tight supply threatened winter reliability, a reminder that grid operators are juggling risk on two fronts at once: the risk of another accident and the risk of blackouts if demand outstrips capacity. This dual pressure is why I see unit 6 less as a side story and more as the template regulators will use to judge whether No. 7 can safely move from fuel loading to full power."
#KashiwazakiKariwa #TEPCOLies #KEPCOLIes #RethinkNotRestart #NoNukes #Geothermal #WaveEnergy #Japan #JapanPol #RenewablesNow #FukushimaIsntOver
-
From my friend in Japan...
Two years after the release of treated water at the #FukushimaDaiichi #nuclear power plant began, more than a hundred thousand tons were washed into the sea, but new #contaminated water is occurring every day
August 24, 2025 at 06:00
"It has been two years since the ocean release of treated water accumulated at the #TEPCO’s Fukushima Daiichi nuclear power plant began. The radioactive substance #tritium remains in the water even after the purification process. In June, China, which completely stopped importing Japanese seafood, resumed production in 37 prefectures, but Fukushima and other ten prefectures are still not eligible. There is no end to the ocean release, and the impact of the nuclear accident on the fishing industry continues.
"Tank treated water and contaminated water have been reduced by only fifty-six thousand tons.
"The ocean release was first released on August 24th, and the 14th time was launched on August 7th this month. Up to the 13th time, a total of one hundred and eighty-seven tons of treated water were released.
"The treated water and contaminated water stored in a tank on the site of the nuclear power plant before it was released into the ocean. So far, it has decreased to about fifty-six thousand tons, and it has not decreased by much the amount of release. The reason is that the contaminated water is generated about seventy tons every day, and the number of groundwater and rainwater increases due to the contact of molten nuclear fuel (debris) in the reactor building. Without the absence of contaminated water, we cannot stop releasing it into the ocean.
"As of July 30th, TEPCO paid about JPY790 billion in compensation in response to the slump in fish prices associated with ocean release. There is a possibility that some of China's resumption of imports will also change the price of fish, but Fukushima Prefecture continues to be stopped.
"37 Export application procedures for fishery products produced in Hokkaido Prefecture have begun. A person in charge of the processing and distribution section of the Fisheries Agency said, 'There are many applications, and the desire to resume is strong. We will continue to work with China to reopen the ten prefectures.' Riki Arai)
"The place where the 'sludge' due to the treatment of contaminated water is about to be full.
"Two years have passed since the release of treated water into the ocean due to the TEPCO’s Fukushima Daiichi nuclear accident. The treated water stored in the nuclear power plant is gradually reduced by ocean release, while the storage and disposal of sludge contaminated with high concentrations that continue to occur in the process of treatment of contaminated water is becoming an issue.
"In the process of removing radioactive substances from contaminated water, sludge is produced by precipitating impurities with chemicals. Liquids and solids are mixed... " [Unfortunately, the rest is behind paywall]
Source:
https://www.tokyo-np.co.jp/article/430612#FukushimaIsntOver #TEPCOLied #TEPCOLies #WaterIsLife #OceansAreLife #WaterContamination #Radiation #Bioaccumulation #NoRadioactiveDumping #RethinkNotRestart #NoNukes #NoMoreFukushimas #NuclearWasteIsForever
-
From 2007:
"Not Again": Yet Another #TEPCO Scandal
Citizens' Nuclear Information Center
"Over the years there have been all sorts of cases of data fabrication and falsification at #nuclear, thermal and hydroelectric power plants. Each time the power companies and plant makers apologize and say that they will lance the wound, but then they go and repeat the same behavior over and over again. When Tokyo Electric Power Company (TEPCO) reported yet another case of data falsification to the Ministry of Economy Trade and Industry (#METI) the headline in the Fukushima local newspaper the following day (1 February 2007) was 'Not Again!', sigh the local people and the Prefectural government '.
"The latest scandal began when Asahi Shimbun newspaper reported on 31 October 2006 that #Chugoku Electric Power Company had falsified data for #DoyoDam on the #MatanoRiver. People might assume that the reason for #ChugokuElectric's admission was simply that it had made a judgment that the problem could no longer be concealed once it was leaked to the newspaper. However, there was more behind the admission than meets the eye. Even before this, anti-dam activists had been pursuing TEPCO over suspicious data related to its dams. For example, it had recorded flow measurements that could not possibly have been taken, because the locations were inaccessible due to heavy snow falls. Chugoku Electric's admission should be seen against this background.
"METI and the Ministry of Land Infrastructure and Transport responded by demanding that all electric power companies check their records. The upshot was that it was discovered that Chugoku Electric was not alone. In fact, it became apparent that all power companies had falsified and fabricated data in relation to such things as subsidence of dam embankments, and alterations to facilities without prior approval.
"The next major development came on November 15th, when it was revealed that Chugoku Electric had falsified data in relation to releases of hot wastewater at its #Shimonoseki thermal power plant. This led to similar revelations for nuclear power plants owned by TEPCO, #Kansai Electric Power Company (#KEPCO), Tohoku Electric Power Company and Japan Atomic Power Company (#JAPCO). On 10 January 2007 TEPCO submitted a report to METI entitled 'Causes of and measures to prevent a repetition of falsification of sea temperature data at the condenser outlets of #KashiwazakiKariwa Nuclear Power Plant, Reactors 1 and 4'.
"The report said, 'An investigation of power plants was instigated, because the Shimonoseki thermal power plant case reminded a worker that corrections had been made to sea temperature data.' As a result, falsification (referred to by TEPCO as "corrections") was discovered at Kashiwazaki-Kariwa reactors 1 & 4 and #Fukushima I reactors 1, 4 & 5.
"The hot wastewater referred to here is seawater, which has been used to cool and condense the steam used to drive the turbines of thermal and nuclear power plants. When the steam from the turbine condenses, its heat is transferred to the coolant, which in this case is seawater. The temperature of the seawater is raised in the process. If the seawater released is too hot, it can affect the ecosystem. Therefore, the temperature at both the intake and outlet points is measured and monitored to ensure that the temperature difference is not too great. At some power plants computers were programmed to record a higher than actual intake temperature, while at others they were programmed to record a lower outlet temperature. The readings were thus falsified to show a lower temperature difference than was really the case.
"On 31 January 2007 TEPCO released details of data falsification at its nuclear power plants. It admitted to a total of about 200 irregularities. A few examples are discussed below.
1. During a periodic inspection in May 1992 at Kashiwazaki-Kariwa reactor number 1 (K-K-1), the day before it was to be tested it was discovered that, due to a fault with the electric motor, the residual heat removal pump (part of the Emergency Core Cooling System (ECCS)) was not working. TEPCO staff made some adjustments to make it appear from the central control room that the pump was working. In this way, they were able to trick the METI inspector into awarding a pass for the inspection.
2. Again at K-K (the reactors are not specified), from around 1995 to 1997, measurements of the concentration of radioactive iodine released from the exhaust stack were made to appear lower than they really were by taking the measurements on the reverse side of the filter. In May 1995 the concentration of radioactivity from rare gases emitted from the exhaust stack of reactor 4 was also falsified.
3. From 1979 to 1998, in order to pass inspections, internal pressure readings for steam pipes connecting the reactor to the turbines at Fukushima I reactor 1 were falsified to match the specifications in the inspection guidelines. It was said that the specifications were inappropriate and that they were later amended so that falsification ceased to be necessary.
"There were many instances of malpractice besides these, in relation to periodic inspections and also in other areas. Fabrication and falsification had indeed become standard practice. Investigations are still proceeding and one cannot help feeling that the most serious and dangerous cases are still to come."
[And indeed it would come, 4 years later!]
http://www.cnic.jp/english/newsletter/nit117/nit117articles/nit117tepco.html
#CitizensNuclearInformatioNcenter #NoNukes #WaterIsLife #OceansAreLife #IAEAHides #TEPCOLies #FukushimaIsntOver #NoDumping #NuclearPowerPlants #RadioactiveWater #RethinkNotRestart #PacificOcean #DataFalsification
-
"The press have repeated a statement initially peddled by #TEPCO, that this contaminated water only includes #tritium. This is untrue, and tritium is not without its own risks. The water being discussed has been through the various filtration systems on site used to remove #radioactive #isotopes. Each system removes some of the radioactive elements in the water. ALPS is the last of these systems. It can remove much of the remaining contamination but not all of it, some radioactive contamination remains in this water.
"We [SimplyInfo] documented back in 2018 that this water contains other problematic radioactive elements including:
#Plutonium (238, 239, 240)
#Americium
#iodine129
#Technetium99
#Cobalt60
#Curium244
#Niobium94
#Europium (152, 154)
#Cesium137
#Strontium90
#Selenium79
#Nickel63
#Tin126 (aka: Sn-126)"As of 2018 the stored post #ALPS water contained 200 billion becquerels of iodine 129, #ruthenium106, and technetium 99. As stored water increases, so does the total volume of contamination within that water.
"TEPCO and the Japanese government have tried to ease concerns by claiming the water will be diluted before it is dumped into the Pacific ocean. This is a meaningless step. The total amount of radioactive #contamination is still dumped into the ocean, you just dumped some additional water beside it at the same time."
#Japan #JapanGovernment #TEPCOLies #IAEA #IAEAFail #FukushimaDaiichi #Fukushima #FukushimaWater