#bridlewood β Public Fediverse posts
Live and recent posts from across the Fediverse tagged #bridlewood, aggregated by home.social.
-
On today's #ottbike #Brodie #winterbike #Bridlewood ride I tried to add some paths and other roads to my usual route which I was getting tired of. Some of the side streets proved not ready for easy riding yet due to slushy conditions and the path around the pond is still not fully open. Looking forward to the no snow and no salt season and getting back on the NorcoSceneVLT #ebiike.
-
Not the first, but the second, #NorcoSceneVLT #ebike #winterbike #ottbike #Bridlewood & #GlenCairn ride of the New Year. Side streets were messy and slippery but the studded tires handled them well, still I avoided them whenever possible. Main streets were bare but wet.
-
Today's #Bridlewood #otbike #winterbike ride was interesting. After doing the #EmeraldMeadows pond (part of the path was still not cleared but snow packed and rideable) I headed toward #Trail24 at #OldQuarry and discovered it was still rideable. There were fat bike and ski tracks as well as parts packed from walking. However someone had been through on something that left a caterpillar track on it and i could not avoid it and every time my tires went over it it was like rumble strip on a highway causing the bike to slip and slide. When I got to the Trans Canada Trail I diverted to that which was not as smooth as the forest trail normally is but butter than dealing with the caterpillar tracks. I headed back home via the small and large hydro line paths.
-
#Bridlewood #OldQuarry #forest #trails route still rideable on #NorcoSceneVLT #ottbike #ebikes. Today's ride.
-
Evolution of an Image β Photo Versions (Emerald Meadows Pond)
#photography #slideshow #PhotoEditing #Bridlewood
http://the5thc.blogspot.com/2024/11/evolution-of-image-photo-versions.html -
Bridlewood Small Hydro Line Pathway Update 2024-11-03
Portion of pathway indicated as under construction is now newly paved. No sign of work continuing on rest of pathway.
http://the5thc.blogspot.com/2024/10/bridlewood-hydro-lines-pathways-update.html
-
First really chilly #Bridlewood #ottbike ride of the season. Felt more like -5 than +5.
Both ends of pathway construction are gravelled and look ready for asphalt. So signs of expanding the amount of pathway being rebuilt. -
Today's #NorcoSceneVLT streets & paths #Bridlewood - #Stittsville #ottbike ride route
-
Today's #Bridlewood roads, paths and trails #ottbike ride
-
Annual Report on Kanata South Pathways Deterioration, Spring 2024
#ottbike #ottcity #MUPs #Bridlewood #GlenCairn
http://the5thc.blogspot.com/2024/05/annual-report-on-kanata-south-pathways.html -
Today's #ottbike #winterbike #Bridlewood & #GlenCairn roads & mostly paths ride. Stayed away from the dirt trails because the warm weather had made them damp and soft and figured there might be some puddles or muddy sections.