#Iceland’s first #windfarm comes with a #water-saving bonus
#Vaðölduver Wind Farm plugs straight into the existing #Búrfell #hydropower infrastructure, sharing 220 kV transmission lines, substations, and access roads. And Iceland’s windiest months coincide with the time of year when less water flows into its reservoirs.
The first 14 turbines are online; another 14 will be installed in a second phase by end of 2027.
Once complete, Vaðölduver will have 120MW of capacity.
https://electrek.co/2026/11/17/iceland-first-wind-farm-gives-its-hydropower-a-winter-boost/
#vadolduver — Public Fediverse posts
Live and recent posts from across the Fediverse tagged #vadolduver, aggregated by home.social.