#samarahan — Public Fediverse posts
Live and recent posts from across the Fediverse tagged #samarahan, aggregated by home.social.
-
Sarawak’s Batang Lupar 1 Bridge: Malaysia’s longest river-crossing bridge opens today #batanglupar1bridge #featured #jambatanbatanglupar #jkr #jkrsarawak #news #samarahan #sarawak #tansriabangjoharitunopeng #transport
-
Sarawak’s Batang Lupar 1 Bridge: Malaysia’s longest river-crossing bridge opens today #batanglupar1bridge #featured #jambatanbatanglupar #jkr #jkrsarawak #news #samarahan #sarawak #tansriabangjoharitunopeng #transport
-
Transit Signal Priority (#TSP) system is now in operation along the #Kuching - #Samarahan Expressway at the ILP and Sarawak Heart Centre roundabouts.
The system, developed by a Sarawakian company, is meant to regulate #traffic along the expressway which will soon have an #AutonomousRapidTransit (ART) system plying it.
With TSP, it enables traffic lights to go green for the ART whenever the ART passes any intersection.
-
Transit Signal Priority (#TSP) system is now in operation along the #Kuching - #Samarahan Expressway at the ILP and Sarawak Heart Centre roundabouts.
The system, developed by a Sarawakian company, is meant to regulate #traffic along the expressway which will soon have an #AutonomousRapidTransit (ART) system plying it.
With TSP, it enables traffic lights to go green for the ART whenever the ART passes any intersection.
-
The prototype #hydrogen vehicle for Kuching's #autonomous #rapidtransit (ART) system will commence its engineering run at #Isthmus in #Kuching from 4 Sept to 31 Oct.
The #prototype had been fully assembled over a two-week period after arriving at Senari Terminal in Kuching on 5 Aug from Shanghai Port.
The purpose of the engineering run is to identify any potential issues before the start of the proof of concept (POC) exercise in #Samarahan.
-
The prototype #hydrogen vehicle for Kuching's #autonomous #rapidtransit (ART) system will commence its engineering run at #Isthmus in #Kuching from 4 Sept to 31 Oct.
The #prototype had been fully assembled over a two-week period after arriving at Senari Terminal in Kuching on 5 Aug from Shanghai Port.
The purpose of the engineering run is to identify any potential issues before the start of the proof of concept (POC) exercise in #Samarahan.