#tebrau — Public Fediverse posts
Live and recent posts from across the Fediverse tagged #tebrau, aggregated by home.social.
-
Johor’s proposed #LightRailTransit (#LRT) project will have at least three lines with their respective #terminal stations to be located at Ikea #Tebrau, at the #IskandarPuteri area (at either #Legoland or #ForestCity), and at #Senai.
The entire #Johor LRT project is estimated to cost RM20 billion with a total length of 30km and with 50 LRT #stations.
#station #metro #subway #lightmetro #rail #railway #train #proposal
-
On 6 September 2023, there was signing ceremony for #MoU between #Iskandar Regional Development Authority (#IRDA) & Korea Railroad Research Institute (#KRRI).
The MoU is to carry out Proof of Concept (#POC) for Traffic Signal Prioritization System (#TSPS) related to the Iskandar Rapid Transit (#IRT) project.
The POC will help IRT in terms of efficient operation & smooth traffic along the #Tebrau IRT Main Trunk at Jalan Tebrau when it is implemented soon.
(Photos by IRT)
-
On 6 September 2023, there was signing ceremony for #MoU between #Iskandar Regional Development Authority (#IRDA) & Korea Railroad Research Institute (#KRRI).
The MoU is to carry out Proof of Concept (#POC) for Traffic Signal Prioritization System (#TSPS) related to the Iskandar Rapid Transit (#IRT) project.
The POC will help IRT in terms of efficient operation & smooth traffic along the #Tebrau IRT Main Trunk at Jalan Tebrau when it is implemented soon.
(Photos by IRT)
-
After much delay over the years, Johor Bahru’s Bus Rapid Transit (#BRT) is targeted for stage-one operation rollout by the third quarter of 2025.
Deemed as the backbone of the Iskandar region’s revamped #publictransport system known as Iskandar Rapid Transit (#IRT), the 55km high-capacity dedicated #buslane is set to feature three lines, namely #IskandarPuteri with 15km stretch, #Skudai (18km), and #Tebrau (22km).
Read more: https://www.thevibes.com/articles/news/98748/johor-bahru-brt-project-begins-for-real
-
Iskandar Regional Development Authority (#IRDA) has put up the #tender statement for the #construction of high capacity #buslane, #station, and relevant #facility for the #Tebrau Line under the Iskandar Rapid Transit (#IRT) project in #Johor.
For more information, please visit the following links (only available in Malay language):
1. IM Web – http://www.irda.com.my/procurement-contracts/
2. MY Procurement – https://myprocurement.treasury.gov.my/iklan/tender/This is for package 4 & 5 covering Tebrau alignment CH0—CH21181 incl. 10 stations.
-
Iskandar Regional Development Authority (#IRDA) has put up the #tender statement for the #construction of high capacity #buslane, #station, and relevant #facility for the #Tebrau Line under the Iskandar Rapid Transit (#IRT) project in #Johor.
For more information, please visit the following links (only available in Malay language):
1. IM Web – http://www.irda.com.my/procurement-contracts/
2. MY Procurement – https://myprocurement.treasury.gov.my/iklan/tender/This is for package 4 & 5 covering Tebrau alignment CH0—CH21181 incl. 10 stations.
-
The #Marine #Viaduct, connecting the #RTSLink between #BukitChagar and #WoodlandsNorth made a significant #progress in the #development.
Crossing the #Straits of #Tebrau, the Marine Viaduct terrestrial bridge is 750 meters long from the shoreline of Stulang Laut.
Moreover, few meters from the #Malaysia - #Singapore #border, pier 47 will be the penultimate pier for the RTS Link Project on the Malaysian’s side and will be connected by a drop-in span with pier 48 from the Singaporean’s side.