home.social

#rtslink — Public Fediverse posts

Live and recent posts from across the Fediverse tagged #rtslink, aggregated by home.social.

fetched live
  1. The #Johor state government plan to integrate the #RTSLink, which is slated to begin operations by late 2026, with the state’s own #LRT system & the #HighSpeedRail (#HSR) project which is being mooted for revival

    While RTS Link is on track, both LRT & HSR are still in the proposal stages

    LRT is under consideration of state government before proposing to the Cabinet, the 3 LRT networks will form T-shaped system passing through southern Johor corridor

    Read more: channelnewsasia.com/asia/johor

    #rail

  2. #CoronationSquare is set to be an integral part of the #RapidTransitSystemLink (#RTSLink) between #JohorBaru & Singapore

    It will be connected via an elevated walkway & house about 700 #parking bays for the #raillink project as they are building 210m #walkway to the #RTS

    There will also be 250m walkway from #PersadaJohor to Sultan Ibrahim Customs, Immigration & Quarantine (#CIQ) complex

    Read more: thestar.com.my/news/nation/202

    #RapidTransitSystem #metro #crossborder #rail #railway #subway #train

  3. Rohas Tecnic Bhd (RTB) has bagged a construction contract worth RM199.84 million from #MRTS for the construction and completion of #BukitChagar's #facade for the Johor Bahru–Singapore #RapidTransitSystemLink (#RTSLink) Project - Package 8.

    Rohas-Euco Industries Bhd (REI), a wholly-owned subsidiary of the Rohas Tecnic, and Sediabena Builders Sdn Bhd (SBSB), are both involved in the design and fabrication of steel structures.

    Read more: nst.com.my/business/corporate/

    #RapidTransitSystem #rail #station

  4. Prime Minister Datuk Seri Anwar Ibrahim and his Singapore counterpart Lee Hsien Loong today witness the historic moment of the #RapidTransitSystemLink (#RTSLink) project being symbolically “connected” between #Malaysia & Singapore

    It involves the completion of the #span which is the meeting point of the project’s #marineviaduct between #JohorBaru & Singapore

    The construction had reached a progress level of 65% as of 31 Dec 2023, as scheduled

    Read more: malaymail.com/news/malaysia/20

    #rail #railway

  5. Prime Minister Datuk Seri Anwar Ibrahim and his Singapore counterpart Lee Hsien Loong today witness the historic moment of the #RapidTransitSystemLink (#RTSLink) project being symbolically “connected” between #Malaysia & Singapore

    It involves the completion of the #span which is the meeting point of the project’s #marineviaduct between #JohorBaru & Singapore

    The construction had reached a progress level of 65% as of 31 Dec 2023, as scheduled

    Read more: malaymail.com/news/malaysia/20

    #rail #railway

  6. The sales for the Princess Cove #condominium in #JohorBahru picked up significantly in 2023.

    The heightened interest is largely due to the #RapidTransitSystem (RTS) Link, with its #rail #viaduct and trestle bridge now taking shape across the Strait of Johor.

    The obvious progress is a point of assurance for buyers and that optimism appears to be widely shared among buyers of properties around the #station.

    Read more: straitstimes.com/asia/se-asia/

    #RTSLink #railway #RapidTransitSystemLink #RTS

  7. The sales for the Princess Cove #condominium in #JohorBahru picked up significantly in 2023.

    The heightened interest is largely due to the #RapidTransitSystem (RTS) Link, with its #rail #viaduct and trestle bridge now taking shape across the Strait of Johor.

    The obvious progress is a point of assurance for buyers and that optimism appears to be widely shared among buyers of properties around the #station.

    Read more: straitstimes.com/asia/se-asia/

    #RTSLink #railway #RapidTransitSystemLink #RTS

  8. Amid swirling dust, machinery noise and traffic diversions, the construction of the #JohorBahru - Singapore #RapidTransitSystemLink (#RTSLink) #station next to the JB checkpoint has injected a new level of chaos into the area.

    Business at nearby eateries in #BukitChagar, where the station will be located, has been affected, but the stall owners can put up with the disruption so long the RTS Link brings in more customers when it is completed as scheduled.

    Read more: straitstimes.com/asia/se-asia/

  9. Amid swirling dust, machinery noise and traffic diversions, the construction of the #JohorBahru - Singapore #RapidTransitSystemLink (#RTSLink) #station next to the JB checkpoint has injected a new level of chaos into the area.

    Business at nearby eateries in #BukitChagar, where the station will be located, has been affected, but the stall owners can put up with the disruption so long the RTS Link brings in more customers when it is completed as scheduled.

    Read more: straitstimes.com/asia/se-asia/

  10. The Rapid Transit System (RTS) Link project that connects #JohorBaru to Singapore has passed its halfway construction milestone and is on track to be completed by end-2026.

    The construction of the #RTSLink’s #rail structures, #viaduct and other related areas are currently at 55 per cent completion, while the construction of the Customs, Immigration and Quarantine (#CIQ) Complex is at nine per cent.

    Read more: malaymail.com/news/malaysia/20

    #railway #crossborder #JohorBahru #Johor #Malaysia

  11. #Johor has identified three #LightRailTransit (#LRT) lines that stretches for 30km in and around #JohorBaru.

    A development study had been previously conducted by the Iskandar Regional Development Authority (#IRDA) and Johor Public Transport Corporation (#PAJ).

    The study proposed that the LRT should be developed to complement the #RTSLink which is slated to be completed by early 2027.

    The system will also complement the #EDTP and the #BRT.

    Read more: thestar.com.my/news/nation/202

    #JohorBahru #rail

  12. #Johor has identified three #LightRailTransit (#LRT) lines that stretches for 30km in and around #JohorBaru.

    A development study had been previously conducted by the Iskandar Regional Development Authority (#IRDA) and Johor Public Transport Corporation (#PAJ).

    The study proposed that the LRT should be developed to complement the #RTSLink which is slated to be completed by early 2027.

    The system will also complement the #EDTP and the #BRT.

    Read more: thestar.com.my/news/nation/202

    #JohorBahru #rail

  13. Following the successful completion of a six-month MRTS Young Entrepreneur Program (#MYEP), participants were celebrated in a #Graduation Ceremony on 2 October 2023 in Johor Bahru.

    Khairy Consult Sdn Bhd and Adil Permata Sdn Bhd had provided #supervision during the graduates’ on-site #training, in their roles as the supervising #consultant and main package #contractor respectively, for the RTS Link Project.

    (Photos by RTS Link)

    #RTSLink #Johor #JohorBahru #onsitetraining #industrialtraining

  14. Following the successful completion of a six-month MRTS Young Entrepreneur Program (#MYEP), participants were celebrated in a #Graduation Ceremony on 2 October 2023 in Johor Bahru.

    Khairy Consult Sdn Bhd and Adil Permata Sdn Bhd had provided #supervision during the graduates’ on-site #training, in their roles as the supervising #consultant and main package #contractor respectively, for the RTS Link Project.

    (Photos by RTS Link)

    #RTSLink #Johor #JohorBahru #onsitetraining #industrialtraining

  15. During the tabling of its 2024 budget later this month, the #Johor government will be looking to promote the use of #publictransportation in the #state.

    The state government had inserted “strengthening connectivity through public transportation” in its Johor #Budget 2024 agenda.

    The Johor government wants to encourage the people to make full use of public transportation.

    Read more: thestar.com.my/metro/metro-new

    #RTSLink #BRT #LRT #bus #rail #train #metro #railway #publictransport

  16. During the tabling of its 2024 budget later this month, the #Johor government will be looking to promote the use of #publictransportation in the #state.

    The state government had inserted “strengthening connectivity through public transportation” in its Johor #Budget 2024 agenda.

    The Johor government wants to encourage the people to make full use of public transportation.

    Read more: thestar.com.my/metro/metro-new

    #RTSLink #BRT #LRT #bus #rail #train #metro #railway #publictransport

  17. #Malaysia will discuss with #Singapore to allow the #KTMB #ShuttleTebrau #train service to continue even after the completion of the Johor Bahru-Singapore Rapid Transit System (RTS) Link project.

    Under the previous bilateral #agreement between the two countries, one of the agreed-upon conditions is to cease the operation of the KTMB Shuttle Tebrau service six months after the completion of the #RTSLink project.

    Read more: thestar.com.my/news/nation/202

    #rail #railway #crossborder #international #KTM

  18. #Malaysia will discuss with #Singapore to allow the #KTMB #ShuttleTebrau #train service to continue even after the completion of the Johor Bahru-Singapore Rapid Transit System (RTS) Link project.

    Under the previous bilateral #agreement between the two countries, one of the agreed-upon conditions is to cease the operation of the KTMB Shuttle Tebrau service six months after the completion of the #RTSLink project.

    Read more: thestar.com.my/news/nation/202

    #rail #railway #crossborder #international #KTM

  19. Located in Wadi Hana, the maintenance depot is meant to keep rolling stocks and equipment in good working condition and ensure their longevity and safety.

    Starting from the shoreline of Stulang Laut, the 750 metres long marine #viaduct is currently progressing as planned.

    In accordance to the bilateral agreement signed between two countries, the project is expected to be completed at the end of 2026.

    #RTSLink #WadiHana #StulangLaut #Malaysia #crossborder

  20. Progress of the RTS Link Project. Within the Malaysian boundary, the project comprises of the Bukit Chagar station, Immigration, Customs and Quarantine Complex (#ICQC), terrestrial & marine viaducts and elevated heavy maintenance #depot.

    The Bukit Chagar Station is an RTS Link #Railway #Station, connecting Johor Bahru to Woodlands North in Singapore to facilitate #crossborder transportation & improve connectivity between #Malaysia & Singapore.

    (Photos by RTS Link JB-SG)

    #RTSLink #BukitChagar

  21. Progress of the RTS Link Project. Within the Malaysian boundary, the project comprises of the Bukit Chagar station, Immigration, Customs and Quarantine Complex (#ICQC), terrestrial & marine viaducts and elevated heavy maintenance #depot.

    The Bukit Chagar Station is an RTS Link #Railway #Station, connecting Johor Bahru to Woodlands North in Singapore to facilitate #crossborder transportation & improve connectivity between #Malaysia & Singapore.

    (Photos by RTS Link JB-SG)

    #RTSLink #BukitChagar

  22. The Land Public Transport Agency (APAD) has carried out a surprise Detailed Inspection on the Rapid Transit System (RTS) Link Project to ensure compliance with the approved Railway Scheme.

    The inspection is carried out for the purpose of monitoring the progress of the project in order to comply with all of the requirements set by the stakeholders.

    (Photos by APAD Channel)

    #APAD #RTSLink #rail #railway #train #metro #project #Malaysia #inspection

  23. The Land Public Transport Agency (APAD) has carried out a surprise Detailed Inspection on the Rapid Transit System (RTS) Link Project to ensure compliance with the approved Railway Scheme.

    The inspection is carried out for the purpose of monitoring the progress of the project in order to comply with all of the requirements set by the stakeholders.

    (Photos by APAD Channel)

    #APAD #RTSLink #rail #railway #train #metro #project #Malaysia #inspection

  24. Component testing and integration adjustments are important to ensure the perfection of the quality of the equipment that will be supplied to the RTS Link project connecting Malaysia and Singapore in the future.

    (Photos by APAD Channel)

    #APAD #rail #railway #integrationtest #trialtest #junctionswitch #switch #RTSLink #Malaysia #junction #equipment

  25. Component testing and integration adjustments are important to ensure the perfection of the quality of the equipment that will be supplied to the RTS Link project connecting Malaysia and Singapore in the future.

    (Photos by APAD Channel)

    #APAD #rail #railway #integrationtest #trialtest #junctionswitch #switch #RTSLink #Malaysia #junction #equipment

  26. 14 September 2023 - The Land Public Transport Agency (APAD) participated in the trial test and integration test for the junction switch equipment (switch machine) for the Rapid Transit System (RTS) Link Project held at the premises of the junction manufacturer Vossloh Cogifer Malaysia Sdn. Bhd.

    (Photos by APAD Channel)

    #APAD #rail #railway #integrationtest #trialtest #junctionswitch #switch #RTSLink #Malaysia #junction #equipment

  27. 14 September 2023 - The Land Public Transport Agency (APAD) participated in the trial test and integration test for the junction switch equipment (switch machine) for the Rapid Transit System (RTS) Link Project held at the premises of the junction manufacturer Vossloh Cogifer Malaysia Sdn. Bhd.

    (Photos by APAD Channel)

    #APAD #rail #railway #integrationtest #trialtest #junctionswitch #switch #RTSLink #Malaysia #junction #equipment

  28. Among the matters highlighted in the #knowledgesharing session were the #RTSLink automated #fare collection system, which includes the Contactless Smart Card (CSC), Electronic Fund Transfer Point of Sale (#EFTPOS), #creditcards, #ewallet, and #QRCode.

    A discussion on #taxexemption strategies to encourage #trade between Malaysia and Singapore, as well on the #immigration processes to ease #passengermovement between borders had also taken place.

  29. Malaysia Rapid Transit System (#MRTS) Sdn Bhd received a delegation from the Royal Malaysian Customs Department (Headquarters & Johor State) in a knowledge sharing session on 5 August 2023.

    Held at MRTS Office in Menara Jland, Johor Bahru, the knowledge sharing session began with an overview of the current progress of the #RTSLink Project, as well as the roles and responsibilities in relation to the #crossborder #raillink.

  30. The #Marine #Viaduct, connecting the #RTSLink between #BukitChagar and #WoodlandsNorth made a significant #progress in the #development.

    Crossing the #Straits of #Tebrau, the Marine Viaduct terrestrial bridge is 750 meters long from the shoreline of Stulang Laut.

    Moreover, few meters from the #Malaysia - #Singapore #border, pier 47 will be the penultimate pier for the RTS Link Project on the Malaysian’s side and will be connected by a drop-in span with pier 48 from the Singaporean’s side.