home.social

#roadwork — Public Fediverse posts

Live and recent posts from across the Fediverse tagged #roadwork, aggregated by home.social.

fetched live
  1. “You’re listening to SLICK 92 FM, Bismarck’s home of fresh oil and loose rock. [SFX: Two thick glugs] Now here’s another ad-free hour of music with Little Feet, Dire Straits, Tedeschi Trucks Band and more.”

    #radio #fm #rock #roadwork #northdakota

  2. “You’re listening to SLICK 92 FM, Bismarck’s home of fresh oil and loose rock. [SFX: Two thick glugs] Now here’s another ad-free hour of music with Little Feet, Dire Straits, Tedeschi Trucks Band and more.”

    #radio #fm #rock #roadwork #northdakota

  3. In Belgium, #workplace #heat thresholds are explicit:

    - 29°C for #office work
    - 26°C for moderate work (such as shelf stacking)
    - 22°C for heavy work (such as #warehousing, #construction)
    - 18°C for very heavy work (such as #roadwork)

    When these temperatures are exceeded, #Belgian #employers must take measures such as #cooling, #ventilation, extra breaks and providing drinks

    theconversation.com/heatwaves-

    [2/2]

    #heatwaves #ClimateChange #ClimateEmergency

  4. In Belgium, #workplace #heat thresholds are explicit:

    - 29°C for #office work
    - 26°C for moderate work (such as shelf stacking)
    - 22°C for heavy work (such as #warehousing, #construction)
    - 18°C for very heavy work (such as #roadwork)

    When these temperatures are exceeded, #Belgian #employers must take measures such as #cooling, #ventilation, extra breaks and providing drinks

    theconversation.com/heatwaves-

    [2/2]

    #heatwaves #ClimateChange #ClimateEmergency

  5. Usually, my daily commute is roughly 33km (20 ½ miles), that's a neat 35 minutes drive.
    But not now.
    🚧🚧🚧🚧⛔🚧🚧🚧🚧
    Now, I need to diverge due to multiple road- and railway works which make my journey a 41km (25 ½ miles) ride, but I need 50 minutes because everyone else in my region has also to make at least one detour.
    I know road/railway maintenance is necessary, but has it to be ALL AT ONCE??
    🤬

    #RoadWork
    #Commute
    #Angry

  6. Submitting local road complaints to the city public works website...

    Hopefully whomever setup the form "Trevor" (slow loading javascript showed that before showing the Duluth info) is still checking them...

    #roadwork #constructionseason #potholes #duluthmn

  7. 🚧NEW🚧
    Starting on or about Tue., May 19, 2026, #MCDOT will institute a daily road closure from 9:00am to 3:00pm, on Bradley Boulevard at Congressional Court in #PotomacMD. The emergency pipe replacement work is expected to last until May 22, 2026.
    #mdcommuters #mdroads #mdtraffic #montgomerycountymd #roadwork #workzone

  8. The Canton Fair is just around the corner, and the ACE team is all set!
    We're bringing our One-Stop Road Building Solutions directly to you.
    Can't make it to Guangzhou? No problem! Join our LIVE Stream on YouTube & TikTok for an exclusive virtual tour~
    #CantonFair2026 #ACEGroup #AsphaltPlantManufacturer #ConstructionSolutions #RoadWork #ConstructionEquipment #Innovation #ConstructionMachinery#Infrastructure

  9. The Maryland Department of Transportation State Highway Administration will begin a project to resurface MD109 (Beallsville Road) between MD 28 (Darnestown Road) and Barnesville Road in Dickerson starting Monday, April 6, 2026. The project is expected to be complete by late May, weather permitting.
    🌟 Details ▶️ roads.maryland.gov/mdotsha/pag
    #mdtraffic #mdcommuters #montgomerycountymd #roadwork #MDSHA (image from MDSH)

  10. Alameda’s ongoing street construction marathon continues, but there will be no street construction on Thanksgiving Day, November 27, or the day after, November 28. Enjoy the holiday! In the days before and after, keep an eye out for these extensive road closures and delays. alamedapost.com/news/central-a

    #alameda #CentralAvenueSafetyImprovementProject #construction #RoadWork

  11. Alameda’s ongoing street construction marathon continues, but there will be no street construction on Thanksgiving Day, November 27, or the day after, November 28. Enjoy the holiday! In the days before and after, keep an eye out for these extensive road closures and delays. alamedapost.com/news/central-a

    #alameda #CentralAvenueSafetyImprovementProject #construction #RoadWork

  12. I suspect there are #roundabouts up and down the #UK that have been 'improved' by completely confusing painted lines.
    This one deserves a special award for incompetent #roadwork

    inverness-courier.co.uk/news/i

    #roads #traffic #safety #roadsafety

  13. 🚧 👷‍♀️🚧
    Take a behind the scenes look at the process we use to pave roadways in #montgomerycountymd. The work is done to protect and maintain the County’s roadway transportation infrastructure.
    Please be alert when driving🚗 or walking / bicycling🚶‍♀️🚴‍♂️ through any of our work zones. #MDRoads #MDTraffic #MDCommuters #Commuting #RoadWork #WorkZones

  14. 🦺Update🦺
    Shady Grove Road resurfacing project from Frederick Rd. (Rt. 355) to the I-270 Bridge
    🗓️Start on or about June 15, 2025
    ⏰Work hours 8:00pm- 6:00am (Mon.-Fri.)
    📋4-6 weeks to complete
    NOTE: There will be lane shifts and closures during work hours.
    #montgomerycountymd #mdtraffic #mdroads #mdcommuter #construction #roadwork

  15. 🦺Update🦺
    Shady Grove Road resurfacing project from Frederick Rd. (Rt. 355) to the I-270 Bridge
    🗓️Start on or about June 15, 2025
    ⏰Work hours 8:00pm- 6:00am (Mon.-Fri.)
    📋4-6 weeks to complete
    NOTE: There will be lane shifts and closures during work hours.
    #montgomerycountymd #mdtraffic #mdroads #mdcommuter #construction #roadwork

  16. Producing our high quality, durable, and recycled rubber bases is as easy as 1-2-3
    1. Fill the mold
    2. Close the mold
    3. Bases ready

    💡Okay maybe there's a few more things in between to make them ready for the road, but with our production efficiencies it really does feel this simple. This is just a sneak peek into how we recycle millions of pounds of rubber each year and the life saving devices that they become.

    #highwaysafety #roadsafety #roadwork #workzone #workzonesafety #trafficcontrol

  17. Da ist man nichtsahnend mit #Roadwork beschäftigt & *schwups* läuft einem d. #Habil-Thema 🥊 in einer Zu-Verschenken-Kiste über d. Weg 😯 Qualifikationsschriften haben einfach Bumerangqualitäten - sie kommen immer wieder zu dir zurück…

    #PDLife #TeamLaufen
    #LitWiss #Boxliteratur #BoxRoman #BoxSemantik

  18. With the arrival of the warmer weather🌡️our Highway Services Division have started working on various paving projects throughout #MontgomeryCoMD. They undertake 3 types of 'Paving Projects' & they're outlined in the slides below.
    👷Paving Schedule▶️ montgomerycountymd.gov/dot-hig
    #roadwork #mdtraffic #mdroads #mdcommuters #residentialroadways #workzones #maryland #transportation

  19. Did you know? We offer 3 types of channelizer drums for different climates:

    - Low Density (LD) for colder climates, impact-resistant
    - High Density (HD) for hotter climates, maintains shape
    - Contractor Drum for moderate climates

    3 different types of the TrafFix Channelizer Drum — all providing a long lasting product out on the road and value to our customers.

    traffixdevices.com/products/dr

    #highwaysafety #roadsafety #trafficsafety #workzone #roadwork #trafficcontrol #channelizerdrum #bos

  20. Ever wonder why channelizer drums are used out on the roads?

    1. When all lined up together, they all act as one big deterrent that helps guide and channelize traffic within work zones.
    2. Being large, they act as a physical deterrent
    3. They have a large surface area for sheeting, which is especially helpful at night as it gives you a more reflective object to see

    #highwaysafety #roadsafety #trafficsafety #workzone #roadwork #trafficcontrol #channelizerdrum #bos

  21. Okay...now this is feeling personal... 🤔

    It was only that one time, after all... 🤷

    #sign #roadwork #NotAI

  22. Okay...now this is feeling personal... 🤔

    It was only that one time, after all... 🤷

    #sign #roadwork #NotAI

  23. After more than a decade of planning and community engagement, construction on the Central Avenue Safety Improvement Project will begin on Monday, January 27. Keep an eye out for these road closures in the coming months. alamedapost.com/news/central-a

    #alameda #construction #RoadWork

  24. After more than a decade of planning and community engagement, construction on the Central Avenue Safety Improvement Project will begin on Monday, January 27. Keep an eye out for these road closures in the coming months. alamedapost.com/news/central-a

    #alameda #construction #RoadWork

  25. Jack Hammer

    The temperature outside of my house right now is a balmy 18 degrees Fahrenheit. That’s 14 degrees below freezing for our non-US, non-English temperature unit using readers. It’s really cold. The ground is completely frozen. It’s January 7th. It’s as Winter as you can get.

    At this very moment there is a work crew jack hammering the street in front of our house. They are jack hammering all over the street. I think it’s something to do with upgrading the gas lines or something like that. The city sent us a notice about it months ago and at the time we thought, why the hell are they going to start a project like that in January? What the hell are they thinking? Have they never been in Massachusetts in January before? Everything will be frozen.

    So yeah, we’ve got that jack hammering thing going for us as we start our work day today. Oh yeah, we also have a furniture delivery truck scheduled to show up within the next three hours or so… and the road is being dug up…

    Nice. Ugh.

    #city #Cold #Construction #constructionCrew #deliveryDay #deliveryTruck #freezing #frozen #furnitureDelivery #jackHammer #jackHammering #january #roadCrew #roadWork #winter #workCrew

  26. Jack Hammer

    The temperature outside of my house right now is a balmy 18 degrees Fahrenheit. That’s 14 degrees below freezing for our non-US, non-English temperature unit using readers. It’s really cold. The ground is completely frozen. It’s January 7th. It’s as Winter as you can get.

    At this very moment there is a work crew jack hammering the street in front of our house. They are jack hammering all over the street. I think it’s something to do with upgrading the gas lines or something like that. The city sent us a notice about it months ago and at the time we thought, why the hell are they going to start a project like that in January? What the hell are they thinking? Have they never been in Massachusetts in January before? Everything will be frozen.

    So yeah, we’ve got that jack hammering thing going for us as we start our work day today. Oh yeah, we also have a furniture delivery truck scheduled to show up within the next three hours or so… and the road is being dug up…

    Nice. Ugh.

    #city #Cold #Construction #constructionCrew #deliveryDay #deliveryTruck #freezing #frozen #furnitureDelivery #jackHammer #jackHammering #january #roadCrew #roadWork #winter #workCrew

  27. wakefield, massachusetts
    november 1959

    road work, water street

    flickr.com/photos/dboo/5185484
    flickr.com/photos/dboo/2748995

    part of an archival project, featuring the photographs of nick dewolf

    © the Nick DeWolf Foundation
    Image-use requests are welcome via nickdewolfphotoarchive [at] gmail [dot] com

    #photography #film #blackandwhite #bw #wakefield #massachusetts #street #roadwork #roadcrew #worker #shovel #policeman #people #heavyequipment #steam #1950s