home.social

#rapidrail — Public Fediverse posts

Live and recent posts from across the Fediverse tagged #rapidrail, aggregated by home.social.

  1. An e-hailing driver was charged with cheating Prasarana by making #FalseClaims causing the company to pay RM562,896 into the bank accounts of three firms

    Another e-hailing driver pleaded not guilty to 62 counts of similar charge involving Prasarana, with losses amounting to RM555,949

    Both of them were former staff of the company, the alleged offences were detected in June last year by internal audit dept

    #Prasarana is the parent of #RapidBus and #RapidRail

    Read more: freemalaysiatoday.com/category

  2. An e-hailing driver was charged with cheating Prasarana by making #FalseClaims causing the company to pay RM562,896 into the bank accounts of three firms

    Another e-hailing driver pleaded not guilty to 62 counts of similar charge involving Prasarana, with losses amounting to RM555,949

    Both of them were former staff of the company, the alleged offences were detected in June last year by internal audit dept

    #Prasarana is the parent of #RapidBus and #RapidRail

    Read more: freemalaysiatoday.com/category

  3. After more than a year, the stretch between #MasjidJamek and #Bandaraya #LRT #stations on the #AmpangLine has reopened

    #Repair works were fully completed in December 2023 and tests carried out last month

    The Ministry of Transport (#MOT) would continue monitoring the area as construction works are still ongoing next to the #station

    #Prasarana is seeking RM38mil in #compensation from the developer

    Read more: thestar.com.my/news/nation/202

    #RapidRail #MyRapid #SriPetalingLine #AGL #SPL #rail #railway

  4. After more than a year, the stretch between #MasjidJamek and #Bandaraya #LRT #stations on the #AmpangLine has reopened

    #Repair works were fully completed in December 2023 and tests carried out last month

    The Ministry of Transport (#MOT) would continue monitoring the area as construction works are still ongoing next to the #station

    #Prasarana is seeking RM38mil in #compensation from the developer

    Read more: thestar.com.my/news/nation/202

    #RapidRail #MyRapid #SriPetalingLine #AGL #SPL #rail #railway

  5. After more than a year, the stretch between #MasjidJamek and #Bandaraya #LRT #stations on the #AmpangLine has reopened

    #Repair works were fully completed in December 2023 and tests carried out last month

    The Ministry of Transport (#MOT) would continue monitoring the area as construction works are still ongoing next to the #station

    #Prasarana is seeking RM38mil in #compensation from the developer

    Read more: thestar.com.my/news/nation/202

    #RapidRail #MyRapid #SriPetalingLine #AGL #SPL #rail #railway

  6. #Commuters from #Ampang & #PutraHeights #LRT #stations can reach #MasjidJamek #station directly from 1 Feb

    #Passengers no longer need to disembark at #HangTuah station to catch connecting train to Masjid Jamek

    However, #passenger still need to use the free #shuttle #bus to continue journey between Masjid Jamek & #Bandaraya stations

    #RapidRail will carry out final trial between Masjid Jamek & Bandaraya in preparation of full reopening

    Read more: freemalaysiatoday.com/category

    #shuttlebus #AGL #SPL

  7. #Commuters from #Ampang & #PutraHeights #LRT #stations can reach #MasjidJamek #station directly from 1 Feb

    #Passengers no longer need to disembark at #HangTuah station to catch connecting train to Masjid Jamek

    However, #passenger still need to use the free #shuttle #bus to continue journey between Masjid Jamek & #Bandaraya stations

    #RapidRail will carry out final trial between Masjid Jamek & Bandaraya in preparation of full reopening

    Read more: freemalaysiatoday.com/category

    #shuttlebus #AGL #SPL

  8. #Prasarana will prepare a full #report on the case of a #tyre from a #KLMonorail #train which caught fire and fell onto the road near Jalan Tun Razak in Sentul

    They are still investigating the cause of the #incident, no one was injured in the incident and services were not disrupted

    The Ministry of Transport (#MoT) take this matter seriously and the cause of the incident should be investigated

    Read more: nst.com.my/news/nation/2023/12

    #RapidKL #RapidRail #monorail #Titiwangsa #Sentul #KualaLumpur

  9. #Disabled persons will be able to ride on all #Prasarana #trains and #buses for #free from February.

    The initiative is expected to benefit disabled riders in the #KlangValley, #Penang and #Kuantan, #Pahang.

    The free #ridership programme will be open to all disabled persons who hold the government's official disability card (#OKU card).

    Read more: thestar.com.my/news/nation/202

    #beese #bus #train #rail #railway #metro #LRT #MRT #rapidKL #rapidPenang #rapidKuantan #RapidRail #RapidBus #subway

  10. The #My50 travel pass has gained significant popularity, boasting around 200,000 monthly subscribers in the #KlangValley.

    Transport Minister Anthony Loke said the #initiative emphasises the government's commitment to easing the burden on citizens in its bid to encourage #publictransportation usage.

    The My50 travel pass offers subsidies for #publictransport in #KualaLumpur under the #RapidKL network for only RM50 per month.

    Read more: nst.com.my/news/nation/2023/12

    #RapidRail #railway #rail #train

  11. #Prasarana Malaysia Bhd is committed to making improvements to its transport services to make #publictransport the preferred mode of travel in the #KlangValley.

    The company owns and operates a wide range of transport services under #RapidKL, including the light, mass and bus rapid transit systems (#LRT, #MRT and #BRT), #KLMonorail, and a fleet of stage buses.

    Read more: freemalaysiatoday.com/category

    #RapidBus #RapidRail #bus #buses #beese #BusRapidTransit #LightRailTransit #MassRapidTransit #rail

  12. #Prasarana Malaysia Bhd is committed to making improvements to its transport services to make #publictransport the preferred mode of travel in the #KlangValley.

    The company owns and operates a wide range of transport services under #RapidKL, including the light, mass and bus rapid transit systems (#LRT, #MRT and #BRT), #KLMonorail, and a fleet of stage buses.

    Read more: freemalaysiatoday.com/category

    #RapidBus #RapidRail #bus #buses #beese #BusRapidTransit #LightRailTransit #MassRapidTransit #rail

  13. #Train #commuters are left frustrated by the lack of options to top up their monthly #My50 passses and had to make a beeline at the #station counters in order to do so with only #cash.

    Other #netizens pointed out that it could be an isolated case as other commuters are able to #topup using #QRpay.

    #MRTCorp has reached out and extended an #apology.

    Read more: nst.com.my/news/nst-viral/2023

    #MRT #RapidKL #RapidRail #Prasarana #rail #railway #netizen #commuter

  14. The number of people using Rapid #bus and #rail services has risen to an average of 1.1 million #passenger per day.

    #RapidRail services, which include #LRT, #MRT and #Monorail, recorded an average of 835,119 #passengers per day, with 258,710 users per day on #RapidBus services.

    Rapid Rail had also begun operating four new #train for the LRT #KelanaJayaLine since last September, and the line operates an average of 48 #trains in three-minute interval

    Read more: freemalaysiatoday.com/category

    #railway

  15. The number of people using Rapid #bus and #rail services has risen to an average of 1.1 million #passenger per day.

    #RapidRail services, which include #LRT, #MRT and #Monorail, recorded an average of 835,119 #passengers per day, with 258,710 users per day on #RapidBus services.

    Rapid Rail had also begun operating four new #train for the LRT #KelanaJayaLine since last September, and the line operates an average of 48 #trains in three-minute interval

    Read more: freemalaysiatoday.com/category

    #railway

  16. A fellow transit user known as Ernest Wong is making some kind of update to the improved RapidKL transit map.

    Two new labels are added to highlight and given emphasis about two changes to the map:
    1. LRT3 - isn’t opened yet; will only open in 2025
    2. KTM Skypark - line is suspended since Feb 2023; alternative bus routes to airport shown

    The labels are now pasted on top of official maps in some stations in Kuala Lumpur.

    (Images by Ernest Wong)

    #RapidKL #transitmap #RapidRail #station #LRT3

  17. A fellow transit user known as Ernest Wong is making some kind of update to the improved RapidKL transit map.

    Two new labels are added to highlight and given emphasis about two changes to the map:
    1. LRT3 - isn’t opened yet; will only open in 2025
    2. KTM Skypark - line is suspended since Feb 2023; alternative bus routes to airport shown

    The labels are now pasted on top of official maps in some stations in Kuala Lumpur.

    (Images by Ernest Wong)

    #RapidKL #transitmap #RapidRail #station #LRT3

  18. The use of debit & credit cards as payment methods for #RapidKL’s #train services has been in testing for years.

    #Prasarana is expected to finally begin infrastructure construction for open payment system on RapidKL’s #rapidrail network in March 2024.

    This will take 11 months, with 50% of gantries at station planned to be able to accept open payment mode by February 2025.

    Further down the line, all gantries will be fitted with the new system by August 2025.

    Read more: lowyat.net/2023/309825/rapid-k

  19. The use of debit & credit cards as payment methods for #RapidKL’s #train services has been in testing for years.

    #Prasarana is expected to finally begin infrastructure construction for open payment system on RapidKL’s #rapidrail network in March 2024.

    This will take 11 months, with 50% of gantries at station planned to be able to accept open payment mode by February 2025.

    Further down the line, all gantries will be fitted with the new system by August 2025.

    Read more: lowyat.net/2023/309825/rapid-k

  20. The Light Rail Transit (#LRT) service for the #KelanaJaya Line is expected to achieve a three-minute frequency during peak hours by the end of this month. The current train frequency for peak hours is 3.8 minutes.

    As for the #Kajang Mass Rapid Transit (#MRT) Line, train wheel replacements are underway, and the targeted train frequency during peak hours is set to improve from six minutes to four minutes by end of January 2024.

    Read more: malaymail.com/news/malaysia/20

    #RapidKL #RapidRail #KJL #KGL

  21. The Light Rail Transit (#LRT) service for the #KelanaJaya Line is expected to achieve a three-minute frequency during peak hours by the end of this month. The current train frequency for peak hours is 3.8 minutes.

    As for the #Kajang Mass Rapid Transit (#MRT) Line, train wheel replacements are underway, and the targeted train frequency during peak hours is set to improve from six minutes to four minutes by end of January 2024.

    Read more: malaymail.com/news/malaysia/20

    #RapidKL #RapidRail #KJL #KGL

  22. In recent years, #LRT has been experiencing many technical difficulties that have caused inconvenience to its users, and it’s undeniably nerve-wracking.

    However, we also can’t deny that work is continuously being done for further improvements.

    When we’re sound asleep, that’s when the humans of Prasarana, the team behind RapidKL get to work on #maintenance, and only at midnight.

    Read more: worldofbuzz.com/lrt-crew-work-

    #RapidKL #RapidRail #KlangValley #KualaLumpur #train #rail #track #railway #KJL

  23. In recent years, #LRT has been experiencing many technical difficulties that have caused inconvenience to its users, and it’s undeniably nerve-wracking.

    However, we also can’t deny that work is continuously being done for further improvements.

    When we’re sound asleep, that’s when the humans of Prasarana, the team behind RapidKL get to work on #maintenance, and only at midnight.

    Read more: worldofbuzz.com/lrt-crew-work-

    #RapidKL #RapidRail #KlangValley #KualaLumpur #train #rail #track #railway #KJL

  24. An opposition MP wants the government’s assurance that its decision to revive the construction of five #LRT stations in the #KlangValley will not affect the progress of the #LRT3 project.

    As of the third quarter of 2023, about 86.5% of the LRT3 project had been completed and it is expected to be completed by March 2025.

    Last week, it was announced that five LRT stations in the Klang Valley that were cancelled in 2018 would be revived.

    Read more: freemalaysiatoday.com/category

    #RapidKL #RapidRail

  25. An opposition MP wants the government’s assurance that its decision to revive the construction of five #LRT stations in the #KlangValley will not affect the progress of the #LRT3 project.

    As of the third quarter of 2023, about 86.5% of the LRT3 project had been completed and it is expected to be completed by March 2025.

    Last week, it was announced that five LRT stations in the Klang Valley that were cancelled in 2018 would be revived.

    Read more: freemalaysiatoday.com/category

    #RapidKL #RapidRail

  26. The LRT Ampang/Sri Petaling line is expected to resume operations on 29 February next year after the comprehensive repair work on the flyover and track structure near the Bandaraya LRT station is completed.

    The original plan was to complete the repair work and resume operations by the middle of October, however, some other damage had been detected on the structure of two nearby flyovers which required comprehensive repair works.

    Read more: themalaysianreserve.com/2023/0

    #RapidKL #RapidRail #AGL #SPL

  27. The LRT Ampang/Sri Petaling line is expected to resume operations on 29 February next year after the comprehensive repair work on the flyover and track structure near the Bandaraya LRT station is completed.

    The original plan was to complete the repair work and resume operations by the middle of October, however, some other damage had been detected on the structure of two nearby flyovers which required comprehensive repair works.

    Read more: themalaysianreserve.com/2023/0

    #RapidKL #RapidRail #AGL #SPL

  28. Rapid KL is informing good news for Putrajaya Line MRT feeder bus users.

    From 30 September 2023, the MRT feeder bus service on routes T505 and T511 will be further expanded.

    Refer to the poster for more information.

    (Poster images by Rapid KL)

    #RapidKL #RapidBus #RapidRail #MRT #PYL #Putrajaya #bus #feederbus #T505 #T511 #expansion #Malaysia

  29. Rapid KL is informing good news for Putrajaya Line MRT feeder bus users.

    From 30 September 2023, the MRT feeder bus service on routes T505 and T511 will be further expanded.

    Refer to the poster for more information.

    (Poster images by Rapid KL)

    #RapidKL #RapidBus #RapidRail #MRT #PYL #Putrajaya #bus #feederbus #T505 #T511 #expansion #Malaysia

  30. For more information, check out the Runners Guidebook at drive.google.com/file/d/1LbkNM or download the Official KLSCM App:

    Apple: apps.apple.com/cy/app/klscm/id

    Android: play.google.com/store/apps/det

    You can also check out information on their website at kl-marathon.com/travel/public-

    There are parking facilities provided at some of the train stations as well.

    (3 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #RapidKL #RapidRail #ParkNRide #Parking #Station

  31. For more information, check out the Runners Guidebook at drive.google.com/file/d/1LbkNM or download the Official KLSCM App:

    Apple: apps.apple.com/cy/app/klscm/id

    Android: play.google.com/store/apps/det

    You can also check out information on their website at kl-marathon.com/travel/public-

    There are parking facilities provided at some of the train stations as well.

    (3 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #RapidKL #RapidRail #ParkNRide #Parking #Station

  32. For more information, check out the Runners Guidebook at drive.google.com/file/d/1LbkNM or download the Official KLSCM App:

    Apple: apps.apple.com/cy/app/klscm/id

    Android: play.google.com/store/apps/det

    You can also check out information on their website at kl-marathon.com/travel/public-

    There are parking facilities provided at some of the train stations as well.

    (3 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #RapidKL #RapidRail #ParkNRide #Parking #Station

  33. For more information, check out the Runners Guidebook at drive.google.com/file/d/1LbkNM or download the Official KLSCM App:

    Apple: apps.apple.com/cy/app/klscm/id

    Android: play.google.com/store/apps/det

    You can also check out information on their website at kl-marathon.com/travel/public-

    There are parking facilities provided at some of the train stations as well.

    (3 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #RapidKL #RapidRail #ParkNRide #Parking #Station

  34. For more information, check out the Runners Guidebook at drive.google.com/file/d/1LbkNM or download the Official KLSCM App:

    Apple: apps.apple.com/cy/app/klscm/id

    Android: play.google.com/store/apps/det

    You can also check out information on their website at kl-marathon.com/travel/public-

    There are parking facilities provided at some of the train stations as well.

    (3 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #RapidKL #RapidRail #ParkNRide #Parking #Station

  35. Selected MRT stations along the Kajang & Putrajaya line will also commence operations from 3:30am (Sat) & 1:30am (Sun) and will run at interval of 20 minutes.

    Please refer to the map for the selected stations that will be open.

    LRT and MRT services will be complimentary from 3:30am till 6:00am (Sat) & 1:30am till 6:00am (Sun).

    Normal operation & standard charge will apply thereafter.

    (2 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #MRT #KGL #PYL #Kajang #Putrajaya #RapidKL #RapidRail

  36. Selected MRT stations along the Kajang & Putrajaya line will also commence operations from 3:30am (Sat) & 1:30am (Sun) and will run at interval of 20 minutes.

    Please refer to the map for the selected stations that will be open.

    LRT and MRT services will be complimentary from 3:30am till 6:00am (Sat) & 1:30am till 6:00am (Sun).

    Normal operation & standard charge will apply thereafter.

    (2 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #MRT #KGL #PYL #Kajang #Putrajaya #RapidKL #RapidRail

  37. Selected MRT stations along the Kajang & Putrajaya line will also commence operations from 3:30am (Sat) & 1:30am (Sun) and will run at interval of 20 minutes.

    Please refer to the map for the selected stations that will be open.

    LRT and MRT services will be complimentary from 3:30am till 6:00am (Sat) & 1:30am till 6:00am (Sun).

    Normal operation & standard charge will apply thereafter.

    (2 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #MRT #KGL #PYL #Kajang #Putrajaya #RapidKL #RapidRail

  38. Selected MRT stations along the Kajang & Putrajaya line will also commence operations from 3:30am (Sat) & 1:30am (Sun) and will run at interval of 20 minutes.

    Please refer to the map for the selected stations that will be open.

    LRT and MRT services will be complimentary from 3:30am till 6:00am (Sat) & 1:30am till 6:00am (Sun).

    Normal operation & standard charge will apply thereafter.

    (2 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #MRT #KGL #PYL #Kajang #Putrajaya #RapidKL #RapidRail

  39. Selected MRT stations along the Kajang & Putrajaya line will also commence operations from 3:30am (Sat) & 1:30am (Sun) and will run at interval of 20 minutes.

    Please refer to the map for the selected stations that will be open.

    LRT and MRT services will be complimentary from 3:30am till 6:00am (Sat) & 1:30am till 6:00am (Sun).

    Normal operation & standard charge will apply thereafter.

    (2 of 3)
    (Image is screenshot of KLSCM website)

    #KLSCM #MRT #KGL #PYL #Kajang #Putrajaya #RapidKL #RapidRail

  40. Kuala Lumpur Standard Chartered Marathon (KLSCM) is informing runners that they encourage the runners to take public transport to the KLSCM event this weekend to ensure a quick and easy journey.

    Selected stations on the Ampang, Sri Petaling and Kelana Jaya LRT lines will commence operations from 3:30am (Saturday) and 1:30am (Sunday) and will run at interval of 15 minutes.

    (1 of 3)
    (Map below is by KLSCM)

    #KLSCM #LRT #AGL #SPL #KJL #Ampang #SriPetaling #KelanaJaya #RapidKL #RapidRail #Marathon

  41. Kuala Lumpur Standard Chartered Marathon (KLSCM) is informing runners that they encourage the runners to take public transport to the KLSCM event this weekend to ensure a quick and easy journey.

    Selected stations on the Ampang, Sri Petaling and Kelana Jaya LRT lines will commence operations from 3:30am (Saturday) and 1:30am (Sunday) and will run at interval of 15 minutes.

    (1 of 3)
    (Map below is by KLSCM)

    #KLSCM #LRT #AGL #SPL #KJL #Ampang #SriPetaling #KelanaJaya #RapidKL #RapidRail #Marathon

  42. Kuala Lumpur Standard Chartered Marathon (KLSCM) is informing runners that they encourage the runners to take public transport to the KLSCM event this weekend to ensure a quick and easy journey.

    Selected stations on the Ampang, Sri Petaling and Kelana Jaya LRT lines will commence operations from 3:30am (Saturday) and 1:30am (Sunday) and will run at interval of 15 minutes.

    (1 of 3)
    (Map below is by KLSCM)

    #KLSCM #LRT #AGL #SPL #KJL #Ampang #SriPetaling #KelanaJaya #RapidKL #RapidRail #Marathon

  43. Kuala Lumpur Standard Chartered Marathon (KLSCM) is informing runners that they encourage the runners to take public transport to the KLSCM event this weekend to ensure a quick and easy journey.

    Selected stations on the Ampang, Sri Petaling and Kelana Jaya LRT lines will commence operations from 3:30am (Saturday) and 1:30am (Sunday) and will run at interval of 15 minutes.

    (1 of 3)
    (Map below is by KLSCM)

    #KLSCM #LRT #AGL #SPL #KJL #Ampang #SriPetaling #KelanaJaya #RapidKL #RapidRail #Marathon