home.social

#klangvalley — Public Fediverse posts

Live and recent posts from across the Fediverse tagged #klangvalley, aggregated by home.social.

  1. 35 routes, representing 13% of the total 264 #RapidKL #bus routes in the #KlangValley, including the #MRT #feederbus routes, commenced operational resynchronization from 29 March

    This is because #RapidBus is decommissioning 60 #Volvo SD #B7RLE model #buses that have surpassed their maximum operational lifespan and replacing them with 310 new diesel buses by the end of 2024

    Read more: malaymail.com/news/malaysia/20

    #beese #MyRapid #MRTFeederBus #feeder #Prasarana #busroute

  2. With the OKU SMILE pass, the #disabled community will be able to enjoy #free #train and #bus rides for services provided by #Prasarana from 1 Feb

    The pass is for all existing Prasarana #OKU concession card holders & for new applicants

    Activation and new applications for the OKU SMILE pass begun on 15 Jan 2024

    Read more: thestar.com.my/news/nation/202

    #RapidKL #LRT #MRT #KLMonorail #BRT #bushub #RapidPenang #RapidKuantan #PYL #KGL #KJL #AGL #SPL #BSL #MRL #KlangValley #Penang #Kuantan #KualaLumpur

  3. Those who have taken the train with #KTM will know that the frequency is anywhere between 15 and 30 minutes and if you miss a train, you’ll have to wait for quite some time.

    Recently, a Malaysian radio DJ, JC decided to take the #train with KTM to avoid peak-hour traffic.

    He was utterly disappointed when the train did not show up after more than 1 hour.

    Read more: worldofbuzz.com/ktm-train-fail

    #KTMB #MidValley #TamanWahyu #KTMKomuter #peakhour #commuter #rail #railway #KualaLumpur #KlangValley

  4. A mobile app on all bus routes in the Klang Valley will be launched later this year to provide a smoother and more efficient service.

    The mobile app is currently in the data collection phase.

    It is being jointly developed by Rapid Bus, Kuala Lumpur City Hall (which runs free GoKL buses) and the Selangor government (for its Smart Selangor buses).

    Read more: freemalaysiatoday.com/category

    #rapidkl #rapidbus #bus #gokl #smartselangor #dbkl #selangor #kualalumpur #klangvalley #mobileapp #service

  5. The aim of the site inspection be carried out is to ensure that the construction of the LRT3 obey the railway scheme conditions that was approved which includes the aspects of safety, quality and project development status.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia

  6. The aim of the site inspection be carried out is to ensure that the construction of the LRT3 obey the railway scheme conditions that was approved which includes the aspects of safety, quality and project development status.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia

  7. The aim of the site inspection be carried out is to ensure that the construction of the LRT3 obey the railway scheme conditions that was approved which includes the aspects of safety, quality and project development status.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia

  8. Rail Planning Division of Land Public Transport Agency (APAD) has carried out site inspection for LRT 3 Bandar Utama-Johan Setia Project for the Western Package.

    Among the locations of the inspection carried out were Station 17 Bandar Baru Klang, Station 22 Taman Seri Andalas and Johan Setia Depot.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia

  9. Rail Planning Division of Land Public Transport Agency (APAD) has carried out site inspection for LRT 3 Bandar Utama-Johan Setia Project for the Western Package.

    Among the locations of the inspection carried out were Station 17 Bandar Baru Klang, Station 22 Taman Seri Andalas and Johan Setia Depot.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia

  10. Rail Planning Division of Land Public Transport Agency (APAD) has carried out site inspection for LRT 3 Bandar Utama-Johan Setia Project for the Western Package.

    Among the locations of the inspection carried out were Station 17 Bandar Baru Klang, Station 22 Taman Seri Andalas and Johan Setia Depot.

    (Photos are screenshots from video by APAD Channel)

    #APAD #Klang #Selangor #KlangValley #JohanSetia #BandarBaruKlang #TamanSeriAndalas #LRT #rail #railway #inspection #Malaysia